karotrip.com

Hirakud Dam, Sambalpur, Odisha

Hirakud Dam- Odisha

Hirakud Dam built on Mahanadi River is the longest dam in India. The overall length of the maindam is 4.8 km, and the total length is 25.8km with dam and dykes taken together. The dam isabout 15 km upstream of Sambalpur town in State of Orissa and was the first post independencemajor multipurpose river valley project in India. The dam waters 436000 ha of CCA in Mahanadidelta and has an installed ability (to hold or do something) of 307.5 MW. Hirakud Dam is a (made up of different things) structure of Earth, Concrete and Masonry. Hirakud Dam (stopping and interfering with things) 83400 sq. km (32200 sq miles) of Mahanadi catchments. It has a holding tank (or area) spread of 743 sq km at full holding tank (or area) level and the holding tank (or area) has a storage of 5818 M. (and/combined with) with gross of 8136 M Cum.
Hirakud Dam is built across the Mahanadi River, about 15 km from Sambalpur in the state ofOrissa in India. Built in 1956, the dam is the worlds largest earthen dam.[1] Behind the damextends a lake, Hirakud Holding tank (or area), 55 km long. Hirakud Dam is one of the longestdams in the world, about 16 mi (26 km) in length. It was the first major multipurpose river valleyproject started after Indias independence.Construction history.
Before the terrible and destructive floods of 1937, Sir M. Visveswararya proposed adescribed/explained (act of asking questions and trying to find the truth about something) forstorage holding tanks (or areas) in the Mahanadi (bowl/area drained by a river) to tackle theproblem of floods in the Mahanadi delta. In 1945, under the chairmanship of Dr. B. R. Ambedkar, the then Member of Labour, it was decided to invest in the possible benefits of controlling theMahanadi for multi-purpose use. The Central (rivers, streams, etc.), Crop-watering/rinsing with water and (driving or flying a vehicle to somewhere/figuring out how to get somewhere)Commission took up the work.

0Shares

Leave a Reply